SRINAGAR, JAN 15: The Chief Engineer, Distribution, Kashmir Power Distribution Corporation Limited (KPDCL), has announced a scheduled power shutdown to facilitate the augmentation of conductors from 0.1 ACSR to 0.2 ACSR on the 33KV Budgam-Watrihail line.